Thermal Inspection Services in Tulia, TX
We're prepared to serve Tulia and Swisher County with professional thermal imaging for utility-scale solar installations, agricultural operations, commercial facilities, and feedlots. Based just 25 miles south in Hale County, we provide same-day response with zero travel fees.
Hornet Solar Farm - 600MW Utility-Scale Installation
Hornet Solar (also known as Tulia Solar Farm) stands as one of the largest single-phase solar projects in the United States. With 600 megawatts of capacity (745 MWdc), 1.36 million solar modules spanning 3,800 acres, this facility represents the scale of renewable energy infrastructure we're equipped to serve with professional IEC 62446-3 aligned thermal inspection capabilities.
600 MW
Generation Capacity
1.36M
Solar Modules
25 mi
From Our Base
We're equipped with 640×512 radiometric thermal imaging to detect individual panel defects—hot spots, bypass diode failures, cell cracks, and connection issues—with 2cm RTK GPS positioning for exact defect coordinates. Professional deliverables include georeferenced thermal imagery, CSV defect logs, and reports meeting IEC 62446-3 standards.
Agricultural & Commercial Services
Tulia and Swisher County's agricultural economy—200,000 acres of wheat, 150,000 cattle on feed, and expanding dairy operations—can benefit from thermal imaging for crop insurance assessments, feedlot heat stress management, and grain storage monitoring.
Services Available in Tulia
| Service | Application | Turnaround |
|---|---|---|
| Solar PV Thermography | Utility-scale solar installations (IEC 62446-3) | 48 hours |
| Wheat Freeze Assessment | Insurance claims, harvest planning | 24 hours |
| Feedlot Thermal Monitoring | Heat stress detection, shade analysis | Same day |
| Grain Storage Monitoring | Hot spot detection, moisture migration | 4 hours |
| Commercial Roof Inspection | ASTM C1153 moisture surveys | 24-48 hours |
